Project List, Categories for Possible Funding

You may filter data using the select boxes below:
Parish: Sector: Recovery Value: Implementation Priority: Only Projects
with $ Gap:
   
 
In order to reset record set simply select "Choose..." in all selectors.
To print this page, please make sure the page setup orientation is set to "landscape" and page size is set to "legal". (File>Page Setup) More...
Parish
Sort Asc. Sort Desc.
Project
/Rec. Value
Sort Asc. Sort Desc.
Implementation
Priority
Sort Asc. Sort Desc.
Sector
Sort Asc. Sort Desc.
Estimated
Cost
Sort Asc. Sort Desc.
Secured Funding
Sort Asc. Sort Desc.
Gap
Sort Asc. Sort Desc.
Possible Funding Sources Possible Funding
Total
Sort Asc. Sort Desc.
Remaining Gap
Sort Asc. Sort Desc.
Federal
Sort Asc. Sort Desc.
State
Sort Asc. Sort Desc.
Local
Sort Asc. Sort Desc.
Private
Sort Asc. Sort Desc.
Non-Profit
Sort Asc. Sort Desc.
Other
Sort Asc. Sort Desc.
Allen Assess South-West La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 2,825,000 0 0 0 0 0 2,825,000 -2,750,000
Allen Construct the Mill Creek Reservoir - Moderate Recovery Value Future Economic and Workforce Development 15,190,500 0 15,190,500 0 15,190,500 0 0 0 0 15,190,500 0
Allen Create Industrial Park Business/Marketing Services - Moderate Recovery Value Future Economic and Workforce Development 200,000 0 200,000 0 200,000 0 0 0 0 200,000 0
Allen Establish Building Code & Home Repair Program - Moderate Recovery Value Future Housing and Community Development 166,500 0 166,500 30,000 0 0 5,000 0 0 35,000 131,500
Allen Establish Habitat for Hum. Affiliate & Infill - Moderate Recovery Value Future Housing and Community Development 162,800 0 162,800 162,800 0 0 0 0 0 162,800 0
Allen Establish Parish Revitalization Support Program - Moderate Recovery Value Future Housing and Community Development 300,000 0 300,000 75,000 0 0 0 112,000 0 187,000 113,000
Allen Expand Capacity of Evacuation Shelters - Community Interest Future Public Safety 3,280,000 0 3,280,000 55,000 0 0 0 0 0 55,000 3,225,000
Allen Initiate a Forest Restoration Program - Low Recovery Value Future Economic and Workforce Development 8,219,000 0 8,219,000 1,450,000 3,000,000 0 0 0 0 4,450,000 3,769,000
Allen Initiate Rapid Completion of US 165 - Moderate Recovery Value Future Transportation and Infrastructure 4,400,000 0 4,400,000 2,804,000 0 328,500 0 0 0 3,132,500 1,267,500
Allen Prepare Hospital Hazard Mitigation Plan - Moderate Recovery Value Future Public Health and Healthcare 98,800 13,800 85,000 55,000 0 0 0 0 0 55,000 30,000
Allen Rebuild Louisiana Housing Program - Moderate Recovery Value Future Housing and Community Development 150,000 0 150,000 0 0 0 0 0 0 0 150,000
Allen Remove Debris from Ouiska Chitto Creek - High Recovery Value Future Economic and Workforce Development 156,000 0 156,000 156,000 0 0 0 0 0 156,000 0
Allen Upgrade and Repair Bayou Blue & Kinder Drainage - Low Recovery Value Future Environmental 1,000,000 1,000,000 0 360,000 0 0 0 0 0 360,000 -360,000
Beauregard Assess South-West La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 725,000 0 0 0 0 0 725,000 -650,000
Beauregard Build Multi-Use Community Shelter/Activity Center - Community Interest Future Human Services 2,037,000 0 2,037,000 1,000,000 1,050,000 100,000 50,000 20,000 0 2,220,000 -183,000
Beauregard Develop GIS Mapping for an Environmental Strategy - Low Recovery Value Future Environmental 75,000 0 75,000 0 0 0 0 0 0 0 75,000
Beauregard Establish Affordable Housing Restoration & Dev't - Moderate Recovery Value Future Housing and Community Development 4,500,000 0 4,500,000 50,000 1,090,000 110,000 4,100,000 0 0 5,350,000 -850,000
Beauregard Improve Rural Water System Infrastructure - Moderate Recovery Value Future Transportation and Infrastructure 7,000,000 0 7,000,000 7,000,000 0 0 0 0 0 7,000,000 0
Beauregard Initiate an Airport Land Use Expansion - Community Interest Future Economic and Workforce Development 5,500,596 0 5,500,596 5,500,596 0 0 0 0 0 5,500,596 0
Beauregard Prepare a Downtown DeRidder Revitalization Plan - Moderate Recovery Value Future Economic and Workforce Development 75,000 0 75,000 50,000 0 0 0 0 0 50,000 25,000
Beauregard Revitalize Downtown DeRidder Historic Buildings - Moderate Recovery Value Future Economic and Workforce Development 30,000,000 1,739,366 28,260,634 5,000,000 500,000 10,000,000 0 0 0 15,500,000 12,760,634
Calcasieu Assess South-West La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 2,825,000 0 0 0 0 0 2,825,000 -2,750,000
Calcasieu Construct a new Lock Supplement - Low Recovery Value Future Flood Protection and Coastal Restoration 200,000,000 0 200,000,000 25,000,000 10,000,000 0 0 0 0 35,000,000 165,000,000
Calcasieu Construct America’s Wetlands Discovery Center - Community Interest Future Environmental 16,722,720 1,250,000 15,472,720 7,000,000 0 0 0 0 0 7,000,000 8,472,720
Calcasieu Construct Lake Charles Riverwalk/Parkway - Moderate Recovery Value Future Environmental 11,000,000 0 11,000,000 0 0 0 0 0 0 0 11,000,000
Calcasieu Construct Primary Care/Teaching Facility - Moderate Recovery Value Future Public Health and Healthcare 20,000,000 0 20,000,000 650,000 1,000,000 0 0 0 0 1,650,000 18,350,000
Calcasieu Construct the SWLA Entrepreneurial Center - Moderate Recovery Value Future Economic and Workforce Development 9,000,000 2,750,000 6,250,000 550,000 0 3,000,000 0 0 1,500,000 5,050,000 1,200,000
Calcasieu Construct Tide Gate at Bayou D'Inde - Low Recovery Value Future Flood Protection and Coastal Restoration 3,000,000 0 3,000,000 1,000,000 0 2,000,000 0 0 0 3,000,000 0
Calcasieu Control Salinity at Sabine Pass - Low Recovery Value Future Flood Protection and Coastal Restoration 55,000,000 0 55,000,000 0 0 0 0 0 0 0 55,000,000
Calcasieu Control Salinity Levels at Calcasieu Pass - Low Recovery Value Future Flood Protection and Coastal Restoration 55,000,000 0 55,000,000 0 0 0 0 0 0 0 55,000,000
Calcasieu Create a Minority Business Development Program - Community Interest Future Economic and Workforce Development 600,000 0 600,000 200,000 0 0 5,000 20,000 0 225,000 375,000
Calcasieu Create National Alliance on Mental Illness Housing - Moderate Recovery Value Future Human Services 185,000 0 185,000 145,000 0 40,000 0 0 0 185,000 0
Calcasieu Create Southwest Louisiana Regional Loan Fund - Low Recovery Value Future Economic and Workforce Development 10,000,000 0 10,000,000 4,000,000 200,000 150,000 0 500,000 0 4,850,000 5,150,000
Calcasieu Develop a Cultural & Heritage Tourism Program - Moderate Recovery Value Future Economic and Workforce Development 1,728,000 0 1,728,000 0 0 0 0 15,000 0 15,000 1,713,000
Calcasieu Develop a Lake Charles Main Street Program - High Recovery Value Future Economic and Workforce Development 78,000 0 78,000 70,000 8,000 25,000 0 10,000 0 113,000 -35,000
Calcasieu Develop a Traditional Building Certification Prog. - Moderate Recovery Value Future Economic and Workforce Development 200,000 0 200,000 0 0 0 0 25,000 15,000 40,000 160,000
Calcasieu Develop an Emergency Drainage Management Plan - Low Recovery Value Future Flood Protection and Coastal Restoration 2,000,000 0 2,000,000 50,000 25,000 10,000 0 0 0 85,000 1,915,000
Calcasieu Develop Calc. Lake/Sabine Wetland Debris Project - Moderate Recovery Value Future Environmental 26,000,000 450,000 25,550,000 21,000,000 0 0 0 0 0 21,000,000 4,550,000
Calcasieu Develop Calcasieu Comprehensive Drainage Program - Community Interest Future Transportation and Infrastructure 20,000,000 0 20,000,000 391,000 0 0 0 0 0 391,000 19,609,000
Calcasieu Develop Calcasieu Comprehensive Plan - Moderate Recovery Value Future Housing and Community Development 350,000 26,880 323,120 0 0 0 0 0 0 0 323,120
Calcasieu Develop Calcasieu Reforestation Project - Community Interest Future Environmental 25,000 0 25,000 0 0 0 0 0 0 0 25,000
Calcasieu Develop Regional Technology Centers Program - Community Interest Future Economic and Workforce Development 385,447 0 385,447 0 0 0 0 0 0 0 385,447
Calcasieu Establish Emergency Facilities for Public Safety - Low Recovery Value Future Public Safety 75,000,000 0 75,000,000 0 0 0 0 0 0 0 75,000,000
Calcasieu Establish Incentives for Historic Preservation - Moderate Recovery Value Future Housing and Community Development 60,000 0 60,000 15,000 15,000 0 10,000 0 20,000 60,000 0
Calcasieu Implement Calcasieu River Bridge Replacement EIS - Community Interest Future Transportation and Infrastructure 3,500,000 0 3,500,000 0 0 0 0 0 0 0 3,500,000
Calcasieu Improve Ryan Street Exit and Downtown Access - Moderate Recovery Value Future Transportation and Infrastructure 8,000,000 5,900,000 2,100,000 0 0 0 0 0 0 0 2,100,000
Calcasieu Improve the Volunteer Center and Service - Community Interest Future Human Services 1,870,125 305,800 1,564,325 0 0 0 0 0 0 0 1,564,325
Calcasieu Prepare Coastal Prairie Conservation Garden - Community Interest Future Environmental 385,000 125,000 260,000 0 0 0 0 0 0 0 260,000
Calcasieu Rebuild Very Low Income Elderly Housing - Moderate Recovery Value Future Housing and Community Development 2,001,000 0 2,001,000 2,200,000 0 0 0 0 0 2,200,000 -199,000
Calcasieu Reconstruct Lake Charles Regional Airport Terminal - Moderate Recovery Value Future Transportation and Infrastructure 25,000,000 23,750,000 1,250,000 0 0 0 0 0 0 0 1,250,000
Calcasieu Rehabilitate LCHA Rental Housing - Moderate Recovery Value Future Housing and Community Development 9,700,000 0 9,700,000 0 0 5,925,000 0 0 3,775,000 9,700,000 0
Calcasieu Repair the Calcasieu River Ship Channel - Moderate Recovery Value Future Economic and Workforce Development 17,000,000 0 17,000,000 17,000,000 0 0 0 0 0 17,000,000 0
Calcasieu Restore Frazar Memorial Library - Moderate Recovery Value Future Housing and Community Development 15,000,000 0 15,000,000 3,750,000 2,500,000 0 0 0 1,250,000 7,500,000 7,500,000
Calcasieu Restore Little Pecan Bayou - Community Interest Future Environmental 1,556,598 0 1,556,598 0 1,600,000 0 0 0 0 1,600,000 -43,402
Calcasieu Restore the Little Pecan Hydrologic Zone - Community Interest Future Flood Protection and Coastal Restoration 20,000,000 0 20,000,000 0 6,500,000 0 0 0 0 6,500,000 13,500,000
Calcasieu Restore the SW Louisiana Coastline Barrier - Low Recovery Value Future Flood Protection and Coastal Restoration 96,000,000 0 96,000,000 0 2,600,000 0 0 0 0 2,600,000 93,400,000
Calcasieu Restore/Protect Cheniers for Hurricane Protection - Moderate Recovery Value Future Flood Protection and Coastal Restoration 10,000,000 0 10,000,000 3,000,000 2,000,000 0 0 0 0 5,000,000 5,000,000
Calcasieu Revitalize Downtown Lake Charles - High Recovery Value Future Housing and Community Development 120,000,000 0 120,000,000 0 0 0 0 0 0 0 120,000,000
Calcasieu Support the Louisiana Environmental Res. Center - Community Interest Future Environmental 3,250,000 650,000 2,600,000 0 125,000 0 0 0 0 125,000 2,475,000
Cameron Assess South-West La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 2,500,000 0 0 0 0 0 2,500,000 -2,425,000
Cameron Clear the Old River and Creat Marsh - Low Recovery Value Future Economic and Workforce Development 4,500,000 0 4,500,000 0 0 0 0 0 0 0 4,500,000
Cameron Conduct a Ferry Operations Study - Low Recovery Value Future Transportation and Infrastructure 50,000 0 50,000 0 0 0 0 0 0 0 50,000
Cameron Construct Auxiliary Parish Operat'ns Center (APOC) - Moderate Recovery Value Future Public Safety 4,000,000 0 4,000,000 0 0 0 0 0 0 0 4,000,000
Cameron Create the Calcasieu River Marsh - Low Recovery Value Future Environmental 17,000,000 14,367,000 2,633,000 0 0 0 0 0 0 0 2,633,000
Cameron Develop a Geographical Information System - Low Recovery Value Future Transportation and Infrastructure 85,000 20,000 65,000 30,000 0 0 0 0 0 30,000 35,000
Cameron Develop Elderly Housing - Moderate Recovery Value Future Housing and Community Development 4,800,000 0 4,800,000 4,800,000 0 0 0 0 0 4,800,000 0
Cameron Develop Land Use Planning/ Controls - Low Recovery Value Future Housing and Community Development 900,000 900,000 0 0 0 0 0 0 0 0 0
Cameron Establish Stormwater Action Plans - Moderate Recovery Value Future Flood Protection and Coastal Restoration 20,000 0 20,000 0 0 0 0 0 0 0 20,000
Cameron Identify and Monitor Debris in Calcasieu Lake - Community Interest Future Environmental 1,500,000 0 1,500,000 0 0 0 0 0 0 0 1,500,000
Cameron Improve Grand Lake Drinking Water Capacity - Low Recovery Value Future Transportation and Infrastructure 2,000,000 0 2,000,000 1,500,000 1,500,000 0 0 0 0 3,000,000 -1,000,000
Cameron Improve LA 27 Shoulder and Roadway - Low Recovery Value Future Transportation and Infrastructure 111,550,000 3,222,000 108,328,000 86,662,400 21,656,600 0 0 0 0 108,319,000 9,000
Cameron Monitor Elevation in Cameron Parish - Community Interest Future Flood Protection and Coastal Restoration 215,000 0 215,000 0 0 0 0 0 0 0 215,000
Cameron Rebuild and Repair Cameron Housing - Community Interest Future Housing and Community Development 76,500,000 900,000 75,600,000 0 0 0 0 0 0 0 75,600,000
Cameron Redevelop Seafood/Fishing Infrastructure - Community Interest Future Economic and Workforce Development 3,000,000 0 3,000,000 4,500,000 0 0 1,500,000 100,000 0 6,100,000 -3,100,000
Cameron Repair Cameron Parish Justice & Government Center - Moderate Recovery Value Future Public Safety 3,000,000 0 3,000,000 1,500,000 0 0 0 0 0 1,500,000 1,500,000
Cameron Repair Cameron Wastewater Facilities - Moderate Recovery Value Future Transportation and Infrastructure 3,700,000 0 3,700,000 0 0 0 0 0 0 0 3,700,000
Cameron Repair the Water District Facilities - Low Recovery Value Future Transportation and Infrastructure 26,400,000 0 26,400,000 0 0 0 0 0 0 0 26,400,000
Cameron Restore Coast Reduce Erosion - Moderate Recovery Value Future Flood Protection and Coastal Restoration 96,000,000 0 96,000,000 0 0 0 0 0 0 0 96,000,000
Cameron Restore GIWW - Moderate Recovery Value Future Environmental 208,000,000 0 208,000,000 25,000,000 10,000,000 0 0 0 0 35,000,000 173,000,000
Cameron Restore/Protect Cheniers for Hurricane Protection - Moderate Recovery Value Future Flood Protection and Coastal Restoration 10,000,000 0 10,000,000 5,000,000 0 0 0 0 0 5,000,000 5,000,000
Cameron Support the Seafood/Fishing Industry - Community Interest Future Economic and Workforce Development 17,820,000 0 17,820,000 21,375,000 0 10,000,000 0 0 0 31,375,000 -13,555,000
East Baton Rouge Assess South-Central La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 2,825,000 0 0 0 0 0 2,825,000 -2,750,000
East Baton Rouge Construct a Clinical Research Building - Moderate Recovery Value Future Economic and Workforce Development 28,400,000 6,400,000 22,000,000 0 0 0 0 0 0 0 22,000,000
East Baton Rouge Construct Rental Housing Development - Community Interest Future Housing and Community Development 47,345,800 2,675,000 44,670,800 2,950,000 0 0 0 0 0 2,950,000 41,720,800
East Baton Rouge Construct Scattered Site Mixed Income Housing - Moderate Recovery Value Future Housing and Community Development 445,000,000 0 445,000,000 0 0 0 0 0 0 0 445,000,000
East Baton Rouge Construct School Based Health Centers - Community Interest Future Public Health and Healthcare 8,560,000 4,000,000 4,560,000 4,760,000 0 0 100,000 0 0 4,860,000 -300,000
East Baton Rouge Create Harmony Family Transitnl Recovery Srvcs Ctr - Moderate Recovery Value Future Human Services 6,000,000 0 6,000,000 6,000,000 2,000,000 0 0 0 0 8,000,000 -2,000,000
East Baton Rouge Estab. Multi-Parish Statewide Housing Initiative - High Recovery Value Future Housing and Community Development 250,000,000 0 250,000,000 250,000,000 0 0 0 0 0 250,000,000 0
East Baton Rouge Expand Air Cargo and Industrial Park - Moderate Recovery Value Future Economic and Workforce Development 7,517,837 3,000,000 4,517,837 0 0 0 0 0 0 0 4,517,837
East Baton Rouge Expand PTEC Chemical Industry Workforce Training - Moderate Recovery Value Future Economic and Workforce Development 962,400 576,840 385,560 0 144,360 0 0 0 0 144,360 241,200
East Baton Rouge Expand the Inland River Maritime Terminal - Moderate Recovery Value Future Economic and Workforce Development 25,000,000 0 25,000,000 0 0 0 0 0 0 0 25,000,000
East Baton Rouge Expand the Safe House for Battered Women - Community Interest Future Human Services 6,800,000 59,241 6,740,759 6,740,759 0 0 0 0 0 6,740,759 0
East Baton Rouge Implement Neighborhood Revitalization - Community Interest Future Housing and Community Development 550,000 0 550,000 0 0 0 0 0 0 0 550,000
East Baton Rouge Increase Capital Area Healthcare Delivery Services - Community Interest Future Public Health and Healthcare 11,949,979 10,308,646 1,641,333 0 0 0 0 0 0 0 1,641,333
East Baton Rouge Initiate East Baton Rouge Land Use Program - Low Recovery Value Future Environmental 0 0 0 356,000 0 0 0 0 0 356,000 -356,000
East Baton Rouge Initiate the Community Tree Canopy Recovery Plan - Low Recovery Value Future Environmental 517,977 358,500 159,477 0 0 0 0 0 0 0 159,477
East Baton Rouge Intitiate CDC Technical Assistance & Cap. Building - Moderate Recovery Value Future Housing and Community Development 225,000 0 225,000 150,000 0 0 0 75,000 0 225,000 0
East Baton Rouge Renovate Banks & Harding Elementary - Community Interest Future Education 6,452,802 0 6,452,802 5,162,241 2,000,000 3,162,241 0 0 0 10,324,482 -3,871,680
East Baton Rouge Renovate Crestworth & Glen Oak Middle Schools - Community Interest Future Education 9,070,978 1,200,254 7,870,724 7,256,782 613,942 0 0 0 0 7,870,724 0
East Baton Rouge Renovate Scotlandville Elem/Mid School - Community Interest Future Education 7,777,534 2,974,534 4,803,000 4,000,000 803,000 0 0 0 0 4,803,000 0
East Baton Rouge Synchronize Traffic Signals in Baton Rouge - Low Recovery Value Future Transportation and Infrastructure 10,000,000 0 10,000,000 8,000,000 1,000,000 1,000,000 0 0 0 10,000,000 0
Iberia Assess South-West La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 2,825,000 0 0 0 0 0 2,825,000 -2,750,000
Iberia Construct New Iberia Multiuse Conf./Resource Ctr. - High Recovery Value Future Economic and Workforce Development 30,000,000 3,507,000 26,493,000 3,000,000 0 8,000,000 0 0 0 11,000,000 15,493,000
Iberia Construct New Town homes-ARC of Iberia–Oak Place - Community Interest Future Housing and Community Development 2,700,000 0 2,700,000 0 0 0 0 25,000 0 25,000 2,675,000
Iberia Construct Shelters of Last Resort - Low Recovery Value Future Public Safety 18,000,000 1,800,000 16,200,000 16,200,000 0 0 0 0 0 16,200,000 0
Iberia Construct Shelton Loop Neigh.Assoc.Scattered Sites - Moderate Recovery Value Future Housing and Community Development 3,900,000 0 3,900,000 0 0 0 0 0 0 0 3,900,000
Iberia Constuct Iberia Resp/S.Mutual Help Scattered Sites - Moderate Recovery Value Future Housing and Community Development 14,400,000 0 14,400,000 14,400,000 0 0 0 0 0 14,400,000 0
Iberia Create Iberia Wastewater Authority - Low Recovery Value Future Transportation and Infrastructure 550,000 0 550,000 355,000 195,000 0 0 0 0 550,000 0
Iberia Create Marsh at Weeks Bay - Moderate Recovery Value Future Flood Protection and Coastal Restoration 30,900,000 1,200,000 29,700,000 0 200,000 0 0 0 0 200,000 29,500,000
Iberia Create Marshs at Marsh Island - Moderate Recovery Value Future Flood Protection and Coastal Restoration 10,435,000 1,492,008 8,942,992 0 0 0 0 0 0 0 8,942,992
Iberia Create Port of Iberia Intermodal Capabilities - Low Recovery Value Future Transportation and Infrastructure 6,607,000 0 6,607,000 7,000,000 607,000 0 0 0 0 7,607,000 -1,000,000
Iberia Develop a Marketing Campaign for Iberia Parish - Moderate Recovery Value Future Economic and Workforce Development 500,000 5,000 495,000 300,000 200,000 25,000 0 0 0 525,000 -30,000
Iberia Develop Eagle Point Park - Community Interest Future Economic and Workforce Development 11,900,000 300,000 11,600,000 0 0 0 0 50,000 0 50,000 11,550,000
Iberia Dredge the Delcambre Canal - Moderate Recovery Value Future Economic and Workforce Development 9,200,000 0 9,200,000 8,000,000 0 25,000 0 0 0 8,025,000 1,175,000
Iberia Expand the Twin Parish Port - Low Recovery Value Future Economic and Workforce Development 11,930,000 0 11,930,000 5,000,000 0 100,000 1,000,000 0 0 6,100,000 5,830,000
Iberia Implement a Workforce Training Program - Moderate Recovery Value Future Economic and Workforce Development 1,822,000 601,000 1,221,000 1,622,000 0 0 0 100,000 0 1,722,000 -501,000
Iberia Increase Parish Planning and Recovery Capacity - High Recovery Value Future Economic and Workforce Development 1,400,000 0 1,400,000 1,300,000 50,000 0 0 50,000 0 1,400,000 0
Iberia Initiate Delcambre Redevelopment Plan - Moderate Recovery Value Future Housing and Community Development 90,000 0 90,000 50,000 40,000 0 0 0 0 90,000 0
Iberia Prepare a Master Drainage and Flood Control Plan - Low Recovery Value Future Environmental 1,300,000 0 1,300,000 0 0 0 0 0 0 0 1,300,000
Iberia Restore the Vermilion Bay Shoreline - High Recovery Value Future Flood Protection and Coastal Restoration 4,800,000 0 4,800,000 500,000 2,000,000 0 0 0 0 2,500,000 2,300,000
Iberia United Way Scattered Site Homes Recovery Project - Moderate Recovery Value Future Housing and Community Development 3,900,000 0 3,900,000 0 0 0 0 0 0 0 3,900,000
Jefferson Accomplish Permit Streamlining - Low Recovery Value Future Housing and Community Development 550,000 0 550,000 0 0 0 0 0 0 0 550,000
Jefferson Acquire the Johns Manville property - Low Recovery Value Future Economic and Workforce Development 2,500,000 0 2,500,000 0 0 0 0 0 0 0 2,500,000
Jefferson Assess South-Eastern La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 2,500,000 0 0 0 0 0 2,500,000 -2,425,000
Jefferson Conduct Commuter Rail & Transit Feasibility Study - Moderate Recovery Value Future Transportation and Infrastructure 1,500,000 0 1,500,000 0 0 0 0 0 0 0 1,500,000
Jefferson Conduct E. Bank Airline Bus Term Feasibility Study - High Recovery Value Future Transportation and Infrastructure 500,000 0 500,000 0 0 0 0 0 0 0 500,000
Jefferson Construct an Integrated Traffic Management Center - Moderate Recovery Value Future Transportation and Infrastructure 9,000,000 5,500,000 3,500,000 0 0 0 0 0 0 0 3,500,000
Jefferson Construct Emergency Operation Centers - High Recovery Value Future Public Safety 14,950,000 0 14,950,000 7,000,000 7,950,000 0 0 0 0 14,950,000 0
Jefferson Construct New Orleans Metropolitan Bicycle Network - Community Interest Future Transportation and Infrastructure 3,375,000 0 3,375,000 0 0 0 0 0 0 0 3,375,000
Jefferson Construct the Churchill Technology & Business Park - High Recovery Value Future Economic and Workforce Development 5,460,000 3,250,000 2,210,000 0 0 0 0 0 0 0 2,210,000
Jefferson Create Terrytown Area Redevelopment Plan - Moderate Recovery Value Future Housing and Community Development 290,000 0 290,000 290,000 0 0 0 0 0 290,000 0
Jefferson Dredge Barataria Basin Landbridge - Moderate Recovery Value Future Flood Protection and Coastal Restoration 2,290,000 0 2,290,000 1,715,000 575,000 0 0 0 0 2,290,000 0
Jefferson Expand the Green Project Regional Paint Center - Community Interest Future Environmental 500,000 0 500,000 50,000 0 150,000 100,000 0 0 300,000 200,000
Jefferson Expand the Robert E. Nims Center - Moderate Recovery Value Future Economic and Workforce Development 8,000,000 0 8,000,000 0 0 0 1,600,000 650,000 0 2,250,000 5,750,000
Jefferson Implement a Smart Growth Plan - High Recovery Value Future Environmental 100,000 0 100,000 0 0 0 25,000 0 0 25,000 75,000
Jefferson Implement Abandoned Property Acquisition Prog. - Moderate Recovery Value Future Housing and Community Development 20,000,000 0 20,000,000 20,000,000 0 0 0 0 0 20,000,000 0
Jefferson Implement Asset Building Program - Moderate Recovery Value Future Housing and Community Development 5,000,000 3,000,000 2,000,000 1,000,000 0 5,000,000 0 0 0 6,000,000 -4,000,000
Jefferson Implement Shoreline Protection Measures - Moderate Recovery Value Future Flood Protection and Coastal Restoration 15,000,000 0 15,000,000 15,000,000 0 0 0 0 0 15,000,000 0
Jefferson Implement the Ships for Shores Project - Moderate Recovery Value Future Flood Protection and Coastal Restoration 64,000,000 0 64,000,000 55,640,725 0 0 0 0 0 55,640,725 8,359,275
Jefferson Implement Workforce Initiatives - Moderate Recovery Value Future Economic and Workforce Development 5,000,000 0 5,000,000 925,000 0 0 0 0 0 925,000 4,075,000
Jefferson Instigate Capacity Building - Moderate Recovery Value Future Housing and Community Development 1,008,970 0 1,008,970 700,000 0 0 0 0 0 700,000 308,970
Jefferson Institute Interest Free Bridge Loans - Community Interest Future Economic and Workforce Development 10,000,000 0 10,000,000 10,000,000 0 0 0 0 0 10,000,000 0
Jefferson Manage Municipal Effluent - Moderate Recovery Value Future Environmental 2,939,000 88,000 2,851,000 2,565,900 285,100 0 0 0 0 2,851,000 0
Jefferson Modify Existing Incentive Programs - Moderate Recovery Value Future Economic and Workforce Development 0 0 0 850,000 0 0 0 0 0 850,000 -850,000
Jefferson Provide Business Retention Grants and Loans - Moderate Recovery Value Future Economic and Workforce Development 6,500,000 0 6,500,000 0 0 0 0 0 0 0 6,500,000
Jefferson Provide Financial Assistance to Seafood Industry - Moderate Recovery Value Future Economic and Workforce Development 10,000,000 0 10,000,000 5,000,000 0 0 100,000 0 0 5,100,000 4,900,000
Jefferson Rehabilitate and Re-house Jefferson - Moderate Recovery Value Future Housing and Community Development 352,520,000 0 352,520,000 0 0 0 0 0 0 0 352,520,000
Jefferson Repair and Enhance Drainage Pump Stations - High Recovery Value Future Transportation and Infrastructure 131,100,000 0 131,100,000 200,000 0 0 0 0 0 200,000 130,900,000
Jefferson Repair and Upgrade Drainage Canals and Floodgates - High Recovery Value Future Transportation and Infrastructure 24,020,000 0 24,020,000 5,500,000 0 0 0 0 0 5,500,000 18,520,000
Jefferson Restore and Enhance Traffic Signal System - High Recovery Value Future Transportation and Infrastructure 13,990,000 2,000,000 11,990,000 0 500,000 0 0 0 0 500,000 11,490,000
Jefferson Restore Jefferson Barrier Islands - Moderate Recovery Value Future Flood Protection and Coastal Restoration 5,000,000 0 5,000,000 4,500,000 0 0 0 0 0 4,500,000 500,000
Jefferson Restore Lake Pontchartrain Shoreline - Moderate Recovery Value Future Flood Protection and Coastal Restoration 30,000,000 0 30,000,000 27,000,000 0 1,500,000 0 0 0 28,500,000 1,500,000
Jefferson Restore Rigolettes/Barataria Waterway Wetland - Moderate Recovery Value Future Flood Protection and Coastal Restoration 1,400,000 0 1,400,000 1,400,000 0 0 0 0 0 1,400,000 0
Jefferson Restore the LA-1 Caminada Bridge Connector - Moderate Recovery Value Future Transportation and Infrastructure 28,000,000 0 28,000,000 0 0 0 0 0 0 0 28,000,000
Jefferson Stabilize Lafitte/Barataria Shoreline - Community Interest Future Flood Protection and Coastal Restoration 1,040,000 60,000 980,000 980,000 0 0 0 0 0 980,000 0
Jefferson Davis Assess South-West La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 2,300,000 0 0 0 0 0 2,300,000 -2,225,000
Jefferson Davis Construct Emergency Preparedness Facilities - Community Interest Future Public Safety 24,225,000 0 24,225,000 4,500,000 0 0 0 0 0 4,500,000 19,725,000
Jefferson Davis Create an Oil and Gas Museum - Low Recovery Value Future Economic and Workforce Development 4,525,000 0 4,525,000 0 0 0 4,475,000 50,000 0 4,525,000 0
Jefferson Davis Create Code Enforcement Department - Community Interest Future Housing and Community Development 1,750,000 0 1,750,000 3,500,000 437,500 0 0 0 0 3,937,500 -2,187,500
Jefferson Davis Develop Evacuation Shelters - Moderate Recovery Value Future Public Safety 5,550,000 0 5,550,000 3,450,000 0 0 0 0 0 3,450,000 2,100,000
Jefferson Davis Develop Jeff Davis Revitalization Support Program - Community Interest Future Housing and Community Development 300,000 0 300,000 75,000 0 0 0 112,000 0 187,000 113,000
Jefferson Davis Develop Rebuild Louisiana Housing Program - Community Interest Future Housing and Community Development 150,000 0 150,000 0 150,000 0 0 0 0 150,000 0
Jefferson Davis Develop Transportation for Elderly and Disabled - Low Recovery Value Future Human Services 93,000 93,000 0 0 0 0 0 19,000 0 19,000 -19,000
Jefferson Davis Expand Workforce Development Program - Low Recovery Value Future Economic and Workforce Development 658,750 0 658,750 658,750 0 0 0 0 0 658,750 0
Jefferson Davis Implement Drainage System Study - Low Recovery Value Future Flood Protection and Coastal Restoration 65,000 0 65,000 65,000 0 48,750 0 0 0 113,750 -48,750
Jefferson Davis Rebuild & Protect the Lake Arthur Waterfront Dist. - Moderate Recovery Value Future Housing and Community Development 1,455,000 0 1,455,000 0 0 0 0 0 0 0 1,455,000
Jefferson Davis Upgrade Evacuation Route - Low Recovery Value Future Transportation and Infrastructure 74,431,000 45,000,000 29,431,000 45,355,000 20,000,000 0 0 0 0 65,355,000 -35,924,000
Jefferson Davis Upgrade Water and Wastewater Facility - Community Interest Future Transportation and Infrastructure 3,549,000 0 3,549,000 11,534,250 2,661,750 0 0 0 0 14,196,000 -10,647,000
Lafourche Assess SE Louisiana Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 325,000 0 0 0 0 0 325,000 -250,000
Lafourche Conduct Comp Access Management Study for LA 1 - Moderate Recovery Value Future Transportation and Infrastructure 300,000 0 300,000 0 200,000 50,000 0 50,000 0 300,000 0
Lafourche Conduct Critical Facilities Inventory - Moderate Recovery Value Future Public Safety 20,000 0 20,000 12,500 2,500 0 0 0 0 15,000 5,000
Lafourche Constr. Sanitary Sewer Wastewater Treatment System - High Recovery Value Future Transportation and Infrastructure 13,650,000 0 13,650,000 11,995,000 1,000,000 655,000 0 0 0 13,650,000 0
Lafourche Construct LA 1 Improvementments - GM to PF - High Recovery Value Future Transportation and Infrastructure 650,000,000 258,833,000 391,167,000 0 0 0 0 0 0 0 391,167,000
Lafourche Create a Business and Community Resource Database - Low Recovery Value Future Economic and Workforce Development 100,000 0 100,000 0 70,000 20,000 10,000 0 0 100,000 0
Lafourche Develop a Special Needs Registration Database - Moderate Recovery Value Future Human Services 72,000 0 72,000 54,000 39,600 0 0 14,400 0 108,000 -36,000
Lafourche Develop and Implement Mental Wellness Seminars - Community Interest Future Public Health and Healthcare 10,000 0 10,000 3,000 3,000 0 0 4,000 0 10,000 0
Lafourche Develop Emergency Family Plans - Moderate Recovery Value Future Public Safety 1,750 0 1,750 0 0 0 1,500 250 0 1,750 0
Lafourche Develop Skilled Labor Workforce - Moderate Recovery Value Future Economic and Workforce Development 130,000 0 130,000 100,000 0 20,000 10,000 0 0 130,000 0
Lafourche Develop Thibodaux Civic Center Marketing Strategy - Community Interest Future Economic and Workforce Development 15,000 0 15,000 0 10,000 5,000 0 0 0 15,000 0
Lafourche Develop Unifide Dev. Code for Lafourche Parish - Moderate Recovery Value Future Housing and Community Development 300,000 0 300,000 240,000 30,000 30,000 0 0 0 300,000 0
Lafourche Establish Bio-Renewal Ethanol Plant - Moderate Recovery Value Future Economic and Workforce Development 151,000,000 0 151,000,000 50,000,000 25,500,000 0 15,100,000 0 60,400,000 151,000,000 0
Lafourche Initiate the LA-1 Marsh Creation Project - High Recovery Value Future Flood Protection and Coastal Restoration 3,696,000 0 3,696,000 3,743,520 47,520 0 0 0 0 3,791,040 -95,040
Lafourche Manage Effluent--Bayou Lafourche - High Recovery Value Future Environmental 107,000,000 0 107,000,000 92,733,333 7,133,334 7,133,333 0 0 0 107,000,000 0
Lafourche Restore the Lafourche Barrier Island - High Recovery Value Future Flood Protection and Coastal Restoration 95,032,000 0 95,032,000 93,759,250 1,272,750 0 0 0 0 95,032,000 0
Lafourche Restore the Lafourche Parish Coast - High Recovery Value Future Flood Protection and Coastal Restoration 15,000,000 0 15,000,000 12,000,000 1,500,000 1,500,000 0 0 0 15,000,000 0
Lafourche Update Lafourche Emergency Operations Plans - Moderate Recovery Value Future Public Safety 50,000 0 50,000 40,000 10,000 0 100,000 0 0 150,000 -100,000
Orleans Catholic Charities Housing Development - Low Recovery Value Future Housing and Community Development 650,000,000 0 650,000,000 0 0 0 0 0 0 0 650,000,000
Orleans Conduct Detailed Engineering Study of Flooded St. - Community Interest Future Transportation and Infrastructure 2,500,000 0 2,500,000 0 0 0 0 0 0 0 2,500,000
Orleans Conduct Hydraulic Analysis and Leak Evaluation - Moderate Recovery Value Future Transportation and Infrastructure 21,350,000 0 21,350,000 200,000 0 0 0 0 0 200,000 21,150,000
Orleans Construct Mary Queen of Vietnam Sr Housing Project - Moderate Recovery Value Future Housing and Community Development 35,000,000 0 35,000,000 0 0 0 0 0 0 0 35,000,000
Orleans Divert Fresh Water to Bayou Bienvenue - Low Recovery Value Future Flood Protection and Coastal Restoration 10,000,000 0 10,000,000 7,500,000 2,500,000 0 0 0 0 10,000,000 0
Orleans Establish Regional Traffic Management Center - Community Interest Future Transportation and Infrastructure 9,000,000 5,500,000 3,500,000 0 0 0 0 0 0 0 3,500,000
Orleans Establish Sector-Based Business Incubators - High Recovery Value Future Economic and Workforce Development 94,120,000 1,550,000 92,570,000 0 0 0 0 0 0 0 92,570,000
Orleans Expand Cruise-Ship Terminal - Moderate Recovery Value Future Economic and Workforce Development 10,000,000 1,000,000 9,000,000 10,000,000 0 0 0 0 0 10,000,000 -1,000,000
Orleans Feasibility of new East/Central Industrial Park - Low Recovery Value Future Economic and Workforce Development 300,000 0 300,000 0 0 0 0 0 0 0 300,000
Orleans Full Restoration of Two Medical Schools - High Recovery Value Future Public Health and Healthcare 100,000,000 0 100,000,000 700,000,000 0 80,000,000 0 0 0 780,000,000 -680,000,000
Orleans Implement Elements of the LADHH Plan - Moderate Recovery Value Future Public Health and Healthcare 66,354,045 0 66,354,045 900,000 0 0 0 0 0 900,000 65,454,045
Orleans Implement Permanent Housing Dev. Strategy - Moderate Recovery Value Future Housing and Community Development 10,000,000 0 10,000,000 10,000,000 0 0 0 0 0 10,000,000 0
Orleans Increase Crisis & Information Call Center Capacity - Community Interest Future Human Services 1,137,124 916,300 220,824 0 0 0 0 0 0 0 220,824
Orleans Institute Regional Commuter Rail Network - Moderate Recovery Value Future Transportation and Infrastructure 143,500,000 0 143,500,000 0 0 0 0 0 0 0 143,500,000
Orleans Medical Needs Assessment for Orleans Parish - Moderate Recovery Value Future Public Health and Healthcare 250,000 0 250,000 0 0 0 0 0 0 0 250,000
Orleans Prepare a Secondary Flood Protection System Study - Low Recovery Value Future Flood Protection and Coastal Restoration 500,000 0 500,000 0 0 0 0 0 0 0 500,000
Orleans Protect East New Orleans Land Bridge Shore Line - Moderate Recovery Value Future Flood Protection and Coastal Restoration 30,000,000 0 30,000,000 22,500,000 7,500,000 0 0 0 0 30,000,000 0
Orleans Reactivate Medical Research Center in Orleans - Moderate Recovery Value Future Public Health and Healthcare 1,060,000 1,550,000 -490,000 2,000,000 1,500,000 500,000 0 0 0 4,000,000 -4,490,000
Orleans Rebuild JM Bartholomew Municipal Golf Course - Low Recovery Value Future Environmental 6,000,000 0 6,000,000 2,300,000 0 0 0 0 0 2,300,000 3,700,000
Orleans Rebuild New Orleans Urban Forest - Low Recovery Value Future Environmental 8,000,000 0 8,000,000 800,000 0 150,000 0 0 0 950,000 7,050,000
Orleans Reconstruct Downman Road - Low Recovery Value Future Transportation and Infrastructure 9,000,000 0 9,000,000 2,400,000 0 300,000 0 0 0 2,700,000 6,300,000
Orleans Recovery of Neighborhood Business Districts - Moderate Recovery Value Future Economic and Workforce Development 6,400,000 0 6,400,000 6,400,000 0 0 0 0 0 6,400,000 0
Orleans Redevelop Canal Street - High Recovery Value Future Economic and Workforce Development 47,100,000 13,000,000 34,100,000 0 0 0 0 0 0 0 34,100,000
Orleans Relocate and Expand Port of New Orleans Terminals - High Recovery Value Future Transportation and Infrastructure 385,000,000 0 385,000,000 0 0 0 0 0 0 0 385,000,000
Orleans Renovate Priestley School - Moderate Recovery Value Future Education 10,000,000 0 10,000,000 0 0 0 150,000 1,000,000 0 1,150,000 8,850,000
Orleans Re-open New Orleans Charter Science & Math H.S. - Low Recovery Value Future Education 11,540,000 6,910,000 4,630,000 0 0 0 0 0 0 0 4,630,000
Orleans Replace and Widen the Almonaster Bridge - Moderate Recovery Value Future Transportation and Infrastructure 90,000,000 20,000,000 70,000,000 0 0 0 0 0 0 0 70,000,000
Orleans Restart St Mark's Community Center Program & Camp - Low Recovery Value Future Human Services 450,000 0 450,000 0 0 0 0 0 0 0 450,000
Orleans Restore and Improve Public Transit Services - High Recovery Value Future Transportation and Infrastructure 46,500,000 0 46,500,000 0 0 0 0 0 0 0 46,500,000
Orleans Restore City Park - Moderate Recovery Value Future Environmental 43,000,000 0 43,000,000 4,300,000 0 0 0 0 0 4,300,000 38,700,000
Orleans Restore Neighborhood Comprehensive Primary Care - Moderate Recovery Value Future Public Health and Healthcare 87,000,000 0 87,000,000 14,000,000 0 0 1,000,000 0 0 15,000,000 72,000,000
Orleans Restore Wetlands Through Improved WW Treatment - Moderate Recovery Value Future Flood Protection and Coastal Restoration 150,500,000 0 150,500,000 15,050,000 0 0 0 0 0 15,050,000 135,450,000
Orleans Salvage Architectural Artifacts - Low Recovery Value Future Housing and Community Development 1,000,000 0 1,000,000 0 0 0 0 0 0 0 1,000,000
Orleans Stabilize NO East Landbridge Hwy 90 Bank - Moderate Recovery Value Future Flood Protection and Coastal Restoration 3,400,000 0 3,400,000 2,000,000 1,000,000 400,000 0 0 0 3,400,000 0
Orleans Unified Neighborhood-Based Recovery Planning - Moderate Recovery Value Future Housing and Community Development 40,000 40,000 0 0 0 0 0 0 0 0 0
Orleans Workforce Development - Moderate Recovery Value Future Economic and Workforce Development 57,000,000 14,000,000 43,000,000 0 0 0 0 0 0 0 43,000,000
Plaquemines Acquire and Develop a Parish State Park - Community Interest Future Human Services 30,000,000 0 30,000,000 0 0 0 0 0 0 0 30,000,000
Plaquemines Assess South-Eastern La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 0 0 0 0 0 0 0 75,000
Plaquemines Beneficially Use Dredged Material - Moderate Recovery Value Future Flood Protection and Coastal Restoration 16,400,000 0 16,400,000 14,000,000 0 0 0 0 0 14,000,000 2,400,000
Plaquemines Conduct Community Education Workshops on Housing - Community Interest Future Housing and Community Development 340,000 0 340,000 0 0 0 0 0 0 0 340,000
Plaquemines Consolidate and Enhance Sheriff's Office - Moderate Recovery Value Future Public Safety 50,000,000 0 50,000,000 18,000,000 5,000,000 0 0 0 0 23,000,000 27,000,000
Plaquemines Construct a Coastal Slurry Pipeline - Moderate Recovery Value Future Flood Protection and Coastal Restoration 165,000,000 0 165,000,000 142,000,000 0 5,000,000 9,000,000 9,000,000 0 165,000,000 0
Plaquemines Construct WorkSource Training, Ed, & One Stop Ctr. - Moderate Recovery Value Future Economic and Workforce Development 100,000 400,000 -300,000 10,000,000 0 0 0 0 0 10,000,000 -10,300,000
Plaquemines Create Econ Dev, Comm Dev, and Planning in Parish - Moderate Recovery Value Future Economic and Workforce Development 500,000 0 500,000 500,000 0 0 0 0 0 500,000 0
Plaquemines Develop a Comprehensive Master Plan - Low Recovery Value Future Economic and Workforce Development 350,000 0 350,000 0 0 0 0 0 0 0 350,000
Plaquemines Develop AMAX Port Facility & Industrial Park - Moderate Recovery Value Future Economic and Workforce Development 100,000,000 0 100,000,000 0 0 0 0 0 0 0 100,000,000
Plaquemines Develop Emergency Preparedness Operations Ctr-ICC - Low Recovery Value Future Public Safety 15,000,000 0 15,000,000 14,000,000 500,000 500,000 0 0 0 15,000,000 0
Plaquemines Develop Mixed Use Town Center in Belle Chasse - Moderate Recovery Value Future Housing and Community Development 45,415,000 0 45,415,000 0 0 0 0 0 0 0 45,415,000
Plaquemines Develop Oyster Hatchery and Aquaculture Farming - Moderate Recovery Value Future Economic and Workforce Development 539,829 0 539,829 250,000 0 0 0 0 289,829 539,829 0
Plaquemines Develop Sea-Point Container Port - Moderate Recovery Value Future Economic and Workforce Development 165,000,000 0 165,000,000 0 0 0 165,000,000 0 0 165,000,000 0
Plaquemines Develop Shrimp Processing Plant - Moderate Recovery Value Future Economic and Workforce Development 10,000,000 0 10,000,000 4,000,000 0 0 6,000,000 0 0 10,000,000 0
Plaquemines Develop Subsidized Housing for Disabled Persons - Moderate Recovery Value Future Housing and Community Development 260,000 0 260,000 260,000 0 0 0 0 0 260,000 0
Plaquemines Enhance LA Highway 23 for Flood Protection - Moderate Recovery Value Future Flood Protection and Coastal Restoration 766,000 0 766,000 0 766,000,000 0 0 0 0 766,000,000 -765,234,000
Plaquemines Extend Peters Road (LA 3017) - Community Interest Future Transportation and Infrastructure 54,124,300 0 54,124,300 0 0 0 0 0 0 0 54,124,300
Plaquemines Improve & Expand the Venice Oil & Gas Port - Moderate Recovery Value Future Economic and Workforce Development 25,500,000 0 25,500,000 51,000,000 0 0 0 0 0 51,000,000 -25,500,000
Plaquemines Improve Belle Chasse Highway Signalization - Low Recovery Value Future Transportation and Infrastructure 600,000 25,000 575,000 480,000 120,000 0 0 0 0 600,000 -25,000
Plaquemines Plaq Parish Cyber Library & Mobile Comp Lab - Community Interest Future Education 206,348 0 206,348 180,000 0 0 0 0 17,000 197,000 9,348
Plaquemines Redevelop/Expand Plaquemines Medical Center - Moderate Recovery Value Future Public Health and Healthcare 1,880,000 100,000 1,780,000 0 0 0 0 0 0 0 1,780,000
Plaquemines Relocate the Stadium at Fort Jackson - Moderate Recovery Value Future Human Services 5,000,000 0 5,000,000 0 0 0 0 0 0 0 5,000,000
Plaquemines Repair & Expand Daybrook Fisheries Menhaden Plant - High Recovery Value Future Economic and Workforce Development 50,700,000 36,000,000 14,700,000 17,400,000 0 8,700,000 6,000,000 0 0 32,100,000 -17,400,000
Plaquemines Repair and Expand Water and Wastewater/Maint. - Moderate Recovery Value Future Transportation and Infrastructure 5,000,000 0 5,000,000 0 0 0 0 0 0 0 5,000,000
Plaquemines Replace Belle Chasse Highway (LA 23) Tunnel - Moderate Recovery Value Future Transportation and Infrastructure 72,000,000 0 72,000,000 0 0 0 0 0 0 0 72,000,000
Plaquemines Restore E/W Grand Terre Barrier Island - Moderate Recovery Value Future Flood Protection and Coastal Restoration 27,311,634 0 27,311,634 25,300,000 0 0 0 0 0 25,300,000 2,011,634
Plaquemines Restore Fort Jackson and Fort St. Philip - High Recovery Value Future Economic and Workforce Development 500,000 0 500,000 0 0 0 0 0 0 0 500,000
Plaquemines Restore Riverine Sand Mining/ Scofield Island - Moderate Recovery Value Future Flood Protection and Coastal Restoration 27,000,000 0 27,000,000 27,000,000 0 0 0 0 0 27,000,000 0
Plaquemines Restore Spanish Pass Freshwater Diversion - Moderate Recovery Value Future Flood Protection and Coastal Restoration 3,500,000 0 3,500,000 3,500,000 0 0 0 0 0 3,500,000 0
Plaquemines Restore White Ditch Freshwater Diversion - Moderate Recovery Value Future Flood Protection and Coastal Restoration 4,000,000 0 4,000,000 4,000,000 0 0 0 0 0 4,000,000 0
St. Bernard Build a Central Public Safety/Emer Operations Ctr - Moderate Recovery Value Future Public Safety 20,000,000 11,250,000 8,750,000 0 0 0 0 0 0 0 8,750,000
St. Bernard Build Local Government Staffing Capacity - Moderate Recovery Value Future Human Services 3,898,000 0 3,898,000 0 0 0 0 0 0 0 3,898,000
St. Bernard Consolidate the Wastewater Treatment System - Moderate Recovery Value Future Transportation and Infrastructure 45,000,000 35,000,000 10,000,000 10,000,000 0 0 0 0 0 10,000,000 0
St. Bernard Construct a Builder's Row (Model Homes) - Moderate Recovery Value Future Housing and Community Development 3,700,000 0 3,700,000 0 0 0 3,700,000 0 0 3,700,000 0
St. Bernard Construct a Visitors/Welcome Center - Community Interest Future Economic and Workforce Development 2,000,000 0 2,000,000 95,000 0 0 0 0 0 95,000 1,905,000
St. Bernard Construct the Florida Avenue Transportation Co - Community Interest Future Transportation and Infrastructure 288,000,000 195,000,000 93,000,000 1,000,000 0 0 250,000 0 0 1,250,000 91,750,000
St. Bernard Create a Housing Assistance Program - Moderate Recovery Value Future Housing and Community Development 6,340,000 0 6,340,000 2,000,000 0 4,340,000 0 0 0 6,340,000 0
St. Bernard Create a Neighborhood Redevelopment Map - High Recovery Value Future Housing and Community Development 350,000 50,000 300,000 300,000 0 0 0 0 0 300,000 0
St. Bernard Create a Parish-Wide Wireless Network - Community Interest Future Economic and Workforce Development 700,000 0 700,000 150,000 0 100,000 100,000 0 0 350,000 350,000
St. Bernard Create a Small Businesses Services Center - Moderate Recovery Value Future Economic and Workforce Development 200,000 0 200,000 750,000 100,000 0 25,000 0 0 875,000 -675,000
St. Bernard Create Barrier Islands and Reefs in the Biloxi - Low Recovery Value Future Flood Protection and Coastal Restoration 135,000,000 0 135,000,000 101,250,000 47,250,000 0 0 0 0 148,500,000 -13,500,000
St. Bernard Create Barrier Islands in the Jean Louis Robin - Low Recovery Value Future Flood Protection and Coastal Restoration 135,000,000 0 135,000,000 101,250,000 42,250,000 0 0 0 0 143,500,000 -8,500,000
St. Bernard Create Chalmette High School Cultural Cntr. - Moderate Recovery Value Future Education 10,000,000 0 10,000,000 0 0 0 0 0 0 0 10,000,000
St. Bernard Create Marsh in the Central Wetlands - Moderate Recovery Value Future Flood Protection and Coastal Restoration 22,500,000 0 22,500,000 22,475,000 0 0 0 0 0 22,475,000 25,000
St. Bernard Create North & South Land Bridges in Biloxi - Moderate Recovery Value Future Flood Protection and Coastal Restoration 74,000,000 0 74,000,000 75,000,000 0 0 0 0 0 75,000,000 -1,000,000
St. Bernard Design a Storm Surge Barrier Across Lake Borgne - Low Recovery Value Future Flood Protection and Coastal Restoration 250,000 0 250,000 22,500 0 0 0 0 0 22,500 227,500
St. Bernard Develop a Landscape & Gateway Enhancement Master P - Moderate Recovery Value Future Environmental 1,250,000 0 1,250,000 525,000 175,000 0 25,000 25,000 0 750,000 500,000
St. Bernard Develop a Mixed-Use Medical Village - High Recovery Value Future Public Health and Healthcare 215,000,000 22,750,000 192,250,000 0 0 0 0 0 0 0 192,250,000
St. Bernard Develop a Seafood/Farmer's Market - Moderate Recovery Value Future Economic and Workforce Development 3,218,000 0 3,218,000 100,000 0 0 0 1,000,000 0 1,100,000 2,118,000
St. Bernard Develop Cypress 'Islands' Project - Low Recovery Value Future Flood Protection and Coastal Restoration 200,000 0 200,000 200,000 0 0 0 0 0 200,000 0
St. Bernard Divert Freshwater into Bayou Lamoque - Moderate Recovery Value Future Flood Protection and Coastal Restoration 5,375,000 1,205,354 4,169,646 537,500 0 0 0 0 0 537,500 3,632,146
St. Bernard Establish a Housing Information Center - Moderate Recovery Value Future Housing and Community Development 204,000 0 204,000 70,000 24,000 30,000 0 5,000 0 129,000 75,000
St. Bernard Expand and Enhance Val Reiss Park - Low Recovery Value Future Human Services 12,500,000 1,609,107 10,890,893 75,000 1,000,000 0 0 1,000,000 0 2,075,000 8,815,893
St. Bernard Expand the St. Bernard Port - High Recovery Value Future Economic and Workforce Development 187,000,000 1,157,000 185,843,000 359,000 0 0 75,000,000 0 0 75,359,000 110,484,000
St. Bernard Increase the Height of the 40 Arpent Levee System - Moderate Recovery Value Future Flood Protection and Coastal Restoration 75,000,000 0 75,000,000 56,250,000 0 18,750,000 0 0 0 75,000,000 0
St. Bernard Lake Lery Marsh Restoration and Freshwater Diversi - Moderate Recovery Value Future Flood Protection and Coastal Restoration 20,000,000 0 20,000,000 13,000,000 0 0 0 0 0 13,000,000 7,000,000
St. Bernard Reconfigure the Water Treatment Plant - Moderate Recovery Value Future Transportation and Infrastructure 44,000,000 34,000,000 10,000,000 0 0 0 0 0 0 0 10,000,000
St. Bernard Restore Barrier Island: Grand Gossier to Breton So - Low Recovery Value Future Flood Protection and Coastal Restoration 75,000,000 0 75,000,000 0 0 0 0 0 0 0 75,000,000
St. Bernard Restore the Bayou LaLoutre Ridge - Moderate Recovery Value Future Flood Protection and Coastal Restoration 160,000,000 0 160,000,000 136,000,000 0 40,000,000 0 0 0 176,000,000 -16,000,000
St. Bernard Restore the MRGO-Lake Borgne Land Bridge - Moderate Recovery Value Future Flood Protection and Coastal Restoration 67,000,000 32,311,355 34,688,645 0 6,700,000 0 0 0 0 6,700,000 27,988,645
St. Bernard Revitalize the Old Arabi Historic Neighborhood - High Recovery Value Future Economic and Workforce Development 20,480,000 0 20,480,000 2,230,000 25,000 5,000,000 5,000,000 0 0 12,255,000 8,225,000
St. Bernard Upgrade the Stormwater Collection System - Community Interest Future Transportation and Infrastructure 47,650,000 0 47,650,000 47,000,000 0 675,000 0 0 0 47,675,000 -25,000
St. Bernard Write a Comprehensive Land Use Plan and Zon.Ord. - High Recovery Value Future Housing and Community Development 200,000 0 200,000 0 0 0 0 0 0 0 200,000
St. Charles Assess Housing Needs and Capacity Building - Moderate Recovery Value Future Housing and Community Development 426,250 220,500 205,750 0 20,000 0 0 115,750 0 135,750 70,000
St. Charles Assess South-Eastern La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 0 0 0 0 0 0 0 75,000
St. Charles Construct Consolidated Emergency Operations Center - Low Recovery Value Future Public Safety 9,100,000 0 9,100,000 682,500 0 227,500 0 0 0 910,000 8,190,000
St. Charles Construct Port of South Louisiana DryDock Facility - Moderate Recovery Value Future Economic and Workforce Development 80,000,000 15,000,000 65,000,000 0 20,000,000 15,000,000 0 0 0 35,000,000 30,000,000
St. Charles Enhance Community Behavioral Health Program - Moderate Recovery Value Future Public Health and Healthcare 14,849,695 5,100,000 9,749,695 2,846,000 0 0 0 0 0 2,846,000 6,903,695
St. Charles Establish a Regional Transit Program - Moderate Recovery Value Future Transportation and Infrastructure 826,750 511,000 315,750 0 0 0 0 65,750 0 65,750 250,000
St. Charles Implement Community Health Dental Program - Community Interest Future Public Health and Healthcare 1,191,816 816,816 375,000 50,000 0 0 0 0 0 50,000 325,000
St. Charles Implement LA I_I-49 South Connection - Moderate Recovery Value Future Transportation and Infrastructure 855,686,430 0 855,686,430 0 0 0 0 0 0 0 855,686,430
St. Charles Improve St. Charles Wastewater Facility - Moderate Recovery Value Future Transportation and Infrastructure 10,295,000 9,265,500 1,029,500 1,029,500 0 0 0 0 0 1,029,500 0
St. Charles Initiate Land Trust and Housing Development Prog. - Moderate Recovery Value Future Housing and Community Development 9,900,000 4,200,000 5,700,000 0 0 0 5,500,000 0 200,000 5,700,000 0
St. Charles Institute Small Business Recovery Program - Moderate Recovery Value Future Economic and Workforce Development 1,600,000 0 1,600,000 0 0 0 0 0 0 0 1,600,000
St. Charles Update Building Code - Building Capacity - Moderate Recovery Value Future Housing and Community Development 120,000 0 120,000 120,000 0 0 0 0 0 120,000 0
St. Charles Update St. Charles Parish Comprehensive Plan - Moderate Recovery Value Future Housing and Community Development 150,000 60,000 90,000 0 0 90,000 0 0 0 90,000 0
St. Charles Upgrade St. Charles Water Facilities - Moderate Recovery Value Future Transportation and Infrastructure 13,263,465 11,937,118 1,326,347 1,326,346 0 0 0 0 0 1,326,346 1
St. Mary Construct an Ethanol Production Industrial Park - Moderate Recovery Value Future Economic and Workforce Development 30,000,000 0 30,000,000 20,000,000 0 0 10,000,000 0 0 30,000,000 0
St. Mary Dredge Bayou Choupique Channel - Moderate Recovery Value Future Flood Protection and Coastal Restoration 1,500,000 0 1,500,000 500,000 0 500,000 0 0 0 1,000,000 500,000
St. Mary Dredge Bayou Teche Patterson to Jeanerette - High Recovery Value Future Flood Protection and Coastal Restoration 3,000,000 0 3,000,000 1,000,000 2,000,000 0 0 0 0 3,000,000 0
St. Mary Expand LA Tech. College-Young Memorial Campus - Low Recovery Value Future Economic and Workforce Development 3,800,000 791,000 3,009,000 0 0 0 250,000 100,000 0 350,000 2,659,000
St. Mary Improve Flood Ctrl Pump Stations West of Wax Lake - Low Recovery Value Future Flood Protection and Coastal Restoration 12,000,000 0 12,000,000 0 0 0 0 0 0 0 12,000,000
St. Mary Improve HPW Airport Safety and Capacity - High Recovery Value Future Transportation and Infrastructure 3,825,000 71,000 3,754,000 3,075,000 300,000 375,000 0 0 0 3,750,000 4,000
St. Mary Interconnect Municipal Potable Water Systems - Moderate Recovery Value Future Transportation and Infrastructure 14,200,000 10,000,000 4,200,000 15,000,000 0 0 0 0 0 15,000,000 -10,800,000
St. Mary Revitalize Franklin Main Street - High Recovery Value Future Economic and Workforce Development 9,100,000 0 9,100,000 7,000,000 1,000,000 0 1,000,000 100,000 0 9,100,000 0
St. Mary Revitalize of Existing Housing Stock - High Recovery Value Future Housing and Community Development 4,500,000 0 4,500,000 4,500,000 0 0 0 0 0 4,500,000 0
St. Mary Update St. Mary Parish Emergency Preparedness Plan - Moderate Recovery Value Future Public Safety 50,000 0 50,000 50,000 0 4,000 50,000 0 0 104,000 -54,000
St. Tammany Assess South-Eastern LA. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 0 0 0 0 0 0 0 75,000
St. Tammany Build Covington Partners Workforce Housing - Moderate Recovery Value Future Housing and Community Development 12,041,965 6,541,965 5,500,000 0 0 0 0 0 0 0 5,500,000
St. Tammany Construct Afford. Housing Dev. on Scattered Sites - Moderate Recovery Value Future Housing and Community Development 9,650,000 7,471,500 2,178,500 0 0 0 0 0 0 0 2,178,500
St. Tammany Construct Parish Arts/Sci/Tech Ctr - Moderate Recovery Value Future Education 25,000,000 0 25,000,000 0 0 0 0 0 0 0 25,000,000
St. Tammany Construct Slidell Area Criminal Justice Complex - Low Recovery Value Future Public Safety 18,000,000 0 18,000,000 0 0 0 0 0 0 0 18,000,000
St. Tammany Construct Slidell I-10/I-12 Sound Wall - Low Recovery Value Future Transportation and Infrastructure 2,000,000 0 2,000,000 0 2,000,000 0 0 0 0 2,000,000 0
St. Tammany Construct Slidell Old Towne Family Housing - Community Interest Future Housing and Community Development 1,500,000 0 1,500,000 0 0 0 0 0 0 0 1,500,000
St. Tammany Create a System of Small Business Incubators - Moderate Recovery Value Future Economic and Workforce Development 5,000,000 0 5,000,000 1,650,000 0 0 20,000 0 0 1,670,000 3,330,000
St. Tammany Develop a Regional Workforce in Florida Parishes - Moderate Recovery Value Future Economic and Workforce Development 12,000,000 0 12,000,000 700,000 2,500,000 0 0 0 0 3,200,000 8,800,000
St. Tammany Establish Neighborhood Housing Services Office - Community Interest Future Housing and Community Development 355,770 0 355,770 0 0 0 0 0 0 0 355,770
St. Tammany Establish the UNO Research and Technology Park - High Recovery Value Future Economic and Workforce Development 427,500,000 400,000,000 27,500,000 3,000,000 8,500,000 0 0 0 0 11,500,000 16,000,000
St. Tammany Expand and Upgrade Covington Wastewater Treatment - Moderate Recovery Value Future Transportation and Infrastructure 6,580,000 150,000 6,430,000 6,430,000 6,430,000 0 0 0 0 12,860,000 -6,430,000
St. Tammany Expand Mandeville Area Wastewater - High Recovery Value Future Transportation and Infrastructure 34,500,000 0 34,500,000 34,500,000 34,500,000 0 0 0 0 69,000,000 -34,500,000
St. Tammany Expand Slidell Emergency Operations Center - Community Interest Future Public Safety 2,000,000 0 2,000,000 0 0 0 0 0 0 0 2,000,000
St. Tammany Expand Slidell Park Police Sub-Station - Low Recovery Value Future Public Safety 750,000 0 750,000 0 0 0 0 0 0 0 750,000
St. Tammany Extend Slidell Water Lines - Moderate Recovery Value Future Transportation and Infrastructure 3,800,000 0 3,800,000 3,800,000 3,800,000 0 0 0 0 7,600,000 -3,800,000
St. Tammany Improve Lighting on Monroe Street Overpass - Low Recovery Value Future Transportation and Infrastructure 1,200,000 0 1,200,000 0 0 0 0 0 0 0 1,200,000
St. Tammany Improve Parish Drainage Capacity Priority 1 - High Recovery Value Future Flood Protection and Coastal Restoration 352,135,000 60,000,000 292,135,000 0 0 0 0 0 0 0 292,135,000
St. Tammany Improve Slidell/Pearl River Area Wastewater System - High Recovery Value Future Transportation and Infrastructure 109,000,000 0 109,000,000 109,000,000 109,000,000 0 0 0 0 218,000,000 -109,000,000
St. Tammany Install Slidell Northshore Blvd. Traffic Improvm't - Low Recovery Value Future Transportation and Infrastructure 4,000,000 0 4,000,000 0 4,000,000 0 0 0 0 4,000,000 0
St. Tammany Institute Healthcare Training Center of Excellence - Moderate Recovery Value Future Economic and Workforce Development 15,000,000 0 15,000,000 150,000 1,000,000 0 0 0 0 1,150,000 13,850,000
St. Tammany Rebuild Covington Community/Emerg. Operat'ns Ctr - Moderate Recovery Value Future Public Safety 1,860,000 0 1,860,000 0 0 0 0 0 0 0 1,860,000
St. Tammany Reconstruct Madisonville Bulkhead - Community Interest Future Flood Protection and Coastal Restoration 1,080,000 0 1,080,000 1,944,000 0 0 0 0 0 1,944,000 -864,000
St. Tammany Rehabilitate Historic Old Mandeville - Low Recovery Value Future Housing and Community Development 120,000 0 120,000 0 0 0 0 0 0 0 120,000
St. Tammany Renovate Mandeville Harbor Waterfront Rec. Area - Moderate Recovery Value Future Housing and Community Development 450,000 0 450,000 450,000 0 0 0 0 0 450,000 0
St. Tammany Renovate Sheriff's Pearl River Training Facility - Low Recovery Value Future Public Safety 1,270,000 0 1,270,000 0 0 0 0 0 0 0 1,270,000
St. Tammany Restore Public Housing Authority Resources - Moderate Recovery Value Future Housing and Community Development 4,952,260 3,761,000 1,191,260 0 0 0 0 0 0 0 1,191,260
St. Tammany Restore St. Tammany Marsh - Community Interest Future Flood Protection and Coastal Restoration 26,625,000 0 26,625,000 19,968,750 0 0 0 0 0 19,968,750 6,656,250
St. Tammany Update Housing and Community Development Planning - Moderate Recovery Value Future Housing and Community Development 1,494,500 0 1,494,500 0 0 0 0 0 0 0 1,494,500
St. Tammany Upgrade Mandeville EOC-Dispatch Center - Low Recovery Value Future Public Safety 2,500,000 0 2,500,000 0 0 0 0 0 0 0 2,500,000
Tangipahoa Conduct Intermodal Public Transportation Sys Study - Low Recovery Value Future Transportation and Infrastructure 150,000 0 150,000 0 0 0 0 0 0 0 150,000
Tangipahoa Conduct Needs Assmt for S-E La. Med Srvcs - Future Public Health and Healthcare 75,000 0 75,000 0 0 0 0 0 0 0 75,000
Tangipahoa Construct Hammond Community Facilities - Low Recovery Value Future Housing and Community Development 5,850,000 0 5,850,000 3,900,000 1,750,000 100,000 0 0 0 5,750,000 100,000
Tangipahoa Construct Multi Family Housing Units w/Program - Community Interest Future Housing and Community Development 18,000,000 0 18,000,000 11,450,000 6,550,000 0 0 0 0 18,000,000 0
Tangipahoa Construct SAFE HAVEN Vocational Center - Moderate Recovery Value Future Human Services 2,138,585 373,500 1,765,085 0 0 0 0 0 0 0 1,765,085
Tangipahoa Construct Tangipahoa/Pontchartrain Shore Protctn - Moderate Recovery Value Future Environmental 11,830,000 0 11,830,000 7,500,000 0 0 0 0 0 7,500,000 4,330,000
Tangipahoa Create a Housing Resource Center - Community Interest Future Housing and Community Development 75,000 0 75,000 20,000 10,000 10,000 10,000 0 0 50,000 25,000
Tangipahoa Create Institute Healthcare Trng Cntr of Exclnc - Moderate Recovery Value Future Economic and Workforce Development 9,000,000 0 9,000,000 0 0 0 0 0 0 0 9,000,000
Tangipahoa Develop a Regional Workforce in Florida Parishes - Moderate Recovery Value Future Economic and Workforce Development 1,251,560 0 1,251,560 0 0 0 0 10,000 0 10,000 1,241,560
Tangipahoa Develop a Tourism Marketing Program - Moderate Recovery Value Future Economic and Workforce Development 19,550,000 1,150,000 18,400,000 0 0 18,000,000 0 0 0 18,000,000 400,000
Tangipahoa Develop HAEIDD-Hammond Regional Commerce Centre - High Recovery Value Future Economic and Workforce Development 2,200,000 0 2,200,000 250,000 1,650,000 50,000 0 250,000 0 2,200,000 0
Tangipahoa Extend Emergency Bus Service - Low Recovery Value Future Transportation and Infrastructure 500,000 271,000 229,000 0 0 0 0 0 0 0 229,000
Tangipahoa Improve City of Hammond Water/Sewer Systems - Low Recovery Value Future Transportation and Infrastructure 10,500,000 0 10,500,000 10,216,000 0 284,000 0 0 0 10,500,000 0
Tangipahoa Improve Eastern Heights Waterworks - Low Recovery Value Future Transportation and Infrastructure 3,340,000 0 3,340,000 2,338,000 1,002,000 0 0 0 0 3,340,000 0
Tangipahoa Improve Westview Waterworks Company - Low Recovery Value Future Transportation and Infrastructure 1,500,000 0 1,500,000 0 0 0 0 0 0 0 1,500,000
Tangipahoa Prepare Tangipahoa Parish Comprehensive Plan - Moderate Recovery Value Future Housing and Community Development 750,000 0 750,000 75,000 450,000 125,000 100,000 0 0 750,000 0
Tangipahoa Repair and Develop Port Manchac Infrastructure - Low Recovery Value Future Economic and Workforce Development 0 0 0 0 0 0 0 0 0 0 0
Vermilion Build Schools Free From Floods - High Recovery Value Future Education 47,000,000 0 47,000,000 751,750,000 0 0 0 0 0 751,750,000 -704,750,000
Vermilion Comprehensive Master Plan and Zoning Code - High Recovery Value Future Housing and Community Development 150,000 0 150,000 0 0 0 0 0 0 0 150,000
Vermilion Conduct Vocational Training Needs Assessment - High Recovery Value Future Economic and Workforce Development 500,000 0 500,000 0 0 0 0 0 0 0 500,000
Vermilion Construct Communications Shelter - Moderate Recovery Value Future Public Safety 1,500,000 0 1,500,000 0 0 0 0 0 0 0 1,500,000
Vermilion Construct Terraces for Marsh Restoration - Moderate Recovery Value Future Flood Protection and Coastal Restoration 4,000,000 0 4,000,000 2,000,000 2,000,000 0 0 0 0 4,000,000 0
Vermilion Develop Chenier Plain Freshwater Mgmt & Allocation - Moderate Recovery Value Future Flood Protection and Coastal Restoration 12,000,000 0 12,000,000 12,000,000 0 0 0 0 0 12,000,000 0
Vermilion Develop Parish Water and Wastewater Master Plan - Low Recovery Value Future Transportation and Infrastructure 150,000 0 150,000 0 0 0 0 0 0 150,000 0
Vermilion Develop Post-Storm Emergency Action Plan - Moderate Recovery Value Future Flood Protection and Coastal Restoration 300,000 0 300,000 0 0 0 0 0 0 0 300,000
Vermilion Dredge Delcambre Canal - High Recovery Value Future Transportation and Infrastructure 12,000,000 0 12,000,000 8,000,000 0 0 0 0 4,000,000 12,000,000 0
Vermilion Execute a Feasibility Study for Bio-fuel Crops - High Recovery Value Future Economic and Workforce Development 100,000 100,000 0 0 0 0 0 0 0 0 0
Vermilion Expand Twin Parish Port - High Recovery Value Future Economic and Workforce Development 11,930,000 0 11,930,000 100,000 100,000 0 0 0 0 200,000 11,730,000
Vermilion Form Parishwide Economic Development Organization - Moderate Recovery Value Future Economic and Workforce Development 200,000 0 200,000 0 0 0 0 0 0 0 200,000
Vermilion Improve Magnolia Water District WTP - Low Recovery Value Future Transportation and Infrastructure 1,000,000 0 1,000,000 0 0 0 0 0 0 1,000,000 0
Vermilion Increase Capacity of Local Government Leadership - Moderate Recovery Value Future Economic and Workforce Development 5,000 0 5,000 0 0 0 0 5,000 0 5,000 0
Vermilion Initiate Mobile Library Service - Moderate Recovery Value Future Education 200,000 0 200,000 0 0 0 0 0 0 0 200,000
Vermilion Needs Assmnt of S-W La. Medical Srvcs - Future Public Health and Healthcare 75,000 0 75,000 0 0 0 0 0 0 0 75,000
Vermilion Restore Fire Department Coverage - High Recovery Value Future Public Safety 1,750,000 0 1,750,000 0 1,750,000 0 0 0 0 1,750,000 0
Vermilion Restore Marsh by Filling Abandoned Canals - Low Recovery Value Future Flood Protection and Coastal Restoration 400,000 0 400,000 200,000 100,000 0 0 0 0 300,000 100,000
Vermilion Restore Natural Drainage from Freshwater Basins - Moderate Recovery Value Future Flood Protection and Coastal Restoration 6,000,000 0 6,000,000 3,000,000 3,000,000 0 0 0 0 6,000,000 0
Vermilion Stabilize Freshwater Bayou Bank - Moderate Recovery Value Future Flood Protection and Coastal Restoration 1,500,000 0 1,500,000 0 0 0 0 0 0 0 1,500,000
Vermilion Stabilize Rockefeller Refuge Gulf Shoreline - Moderate Recovery Value Future Flood Protection and Coastal Restoration 96,000,000 0 96,000,000 72,000,000 24,000,000 0 0 0 0 96,000,000 0
Vernon Assess South-West La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 0 0 0 0 0 0 0 75,000
Vernon Build Multi-Purpose Community Ctr/Evac. Shelter - Low Recovery Value Future Human Services 3,600,000 0 3,600,000 0 0 0 0 3,000,000 0 3,000,000 600,000
Vernon Complete and Expedite U.S. Highway 28 Expansion - Community Interest Future Transportation and Infrastructure 42,000,000 19,320,000 22,680,000 0 0 0 0 0 0 0 22,680,000
Vernon Dredge and Clear Sales Creek for Flood Prevention - Low Recovery Value Future Flood Protection and Coastal Restoration 100,000 0 100,000 0 90,000 10,000 0 0 0 100,000 0
Vernon Establish a Parish Planning Commission - Low Recovery Value Future Housing and Community Development 75,000 0 75,000 0 0 0 0 0 0 0 75,000
Vernon Establish Vernon Economic Development Corporation - Low Recovery Value Future Economic and Workforce Development 60,000 0 60,000 0 0 30,000 0 15,000 0 45,000 15,000
Vernon Implement Watershed Planning Comm. & Sewer System - Low Recovery Value Future Transportation and Infrastructure 4,000,000 0 4,000,000 0 0 0 0 0 0 0 4,000,000
Vernon Rebuild the Emergency Communications Tower - Community Interest Future Public Safety 180,000 40,000 140,000 140,000 0 0 0 0 0 140,000 0
Washington Assess South-Eastern La. Medical Service Needs - Future Public Health and Healthcare 75,000 0 75,000 0 0 0 0 0 0 0 75,000
Washington Centralize Parish Emergency Operations Center - Moderate Recovery Value Future Public Safety 4,800,000 0 4,800,000 3,780,000 180,000 1,200,000 0 0 0 5,160,000 -360,000
Washington Consolidate Bogalusa YMCAs - Moderate Recovery Value Future Human Services 2,800,000 60,000 2,740,000 0 0 0 500,000 0 0 940,000 1,800,000
Washington Construct Affrdble Houses - Bogalusa, Franklinton - Moderate Recovery Value Future Housing and Community Development 5,623,000 0 5,623,000 0 0 0 0 0 0 0 5,623,000
Washington Construct Healthcare Training Ctr. for Excellence - Moderate Recovery Value Future Economic and Workforce Development 15,000,000 0 15,000,000 0 0 0 0 0 0 0 15,000,000
Washington Establish Regional Rural Transit System - Moderate Recovery Value Future Transportation and Infrastructure 300,000 150,000 150,000 0 30,000 30,000 90,000 0 0 150,000 0
Washington Establish Florida Parish Workforce Training Prog. - Moderate Recovery Value Future Economic and Workforce Development 2,038,895 0 2,038,895 0 500,000 0 0 10,000 0 510,000 1,528,895
Washington Establish Parish-Wide Animal Shelter - Community Interest Future Human Services 150,000 25,000 125,000 0 40,000 0 0 0 0 40,000 85,000
Washington Improve Parish Rural Water Districts - Low Recovery Value Future Transportation and Infrastructure 11,500,000 0 11,500,000 0 0 0 0 0 0 0 11,500,000
Washington Improve to Bogalusa Industrial Park - Low Recovery Value Future Economic and Workforce Development 3,000,000 1,500,000 1,500,000 1,000,000 0 0 0 0 0 1,000,000 500,000
Washington Repair Bogalusa Sewer and Water Systems - Low Recovery Value Future Transportation and Infrastructure 2,900,000 0 2,900,000 0 0 0 0 0 0 0 2,900,000
Washington Replace Damaged Bogalusa Fire Houses - Moderate Recovery Value Future Public Safety 3,000,000 95,052 2,904,948 1,490,000 0 54,000 0 0 0 1,544,000 1,360,948
Washington Restore Cassidy Park & Native American Museum - Moderate Recovery Value Future Human Services 500,000 300,000 200,000 0 0 0 7,000 0 0 7,000 193,000
Washington Washington Parish Master Plan/Housing Needs Assess - Moderate Recovery Value Future Housing and Community Development 400,000 0 400,000 0 0 0 0 0 0 0 400,000
Total Number Projects:  400 Totals:  $ 11,731,579,084 $ 1,410,257,936 $ 10,321,321,148 $ 3,959,864,902 $ 1,279,887,456 $ 260,647,324 $ 317,068,500 $ 17,703,150 $ 71,466,829 $ 5,908,228,161 $ 4,413,092,987